The test phase of the light rail line in Cadiz, Spain, is being successfully completed. Efacec is responsible for the turnkey supply of electrification of the “CONSTRUCTION TRAIN TRANSFER PROJECT BETWEEN CHICLANA DE LA FRONTERA AND SAN FERNANDO “.
The electrification contract (energy systems and catenary) belongs to an internal association of Efacec. It includes the turnkey supply of 4 traction substations of 2 MVA, 14 km of double-track catenary (urban and long-distance), 15 external stations and medium and low voltage distribution network. The Transport unit has been developing and there is still the prospect of providing a 3 kV traction group and the provision of a primary substation to power the Tren-Tram facilities.
The final Client, AOPJA – Agencia de obra pública de la Junta de Andalucía, appreciate the effort and professionalism to meet the deadlines and the technical solution developed.